Vattentäta konstruktioner
|
||
Toulnustouc Dam and Power Plant, Northern Quebec, CanadaUsing the tie-less GRV system with a radius of 18 ft (5.5 m), PERI was able to provide Aecon with a pre-assembled solution to form the entrance area for a diversion tunnel. |

