PERIform Sverige, Projekt - Form, Ställning, Konstruktion - Railway Bridge, Zurich, Switzerland

Broar

       1 | 2 | 3 | 4      

Railway Bridge, Zurich, Switzerland

The construction spanned the bridge cross-section with a 22 m long steel truss framework. When concreting (see above), the carriage was supported on the outer box girders and for moving, the carriage was held on the centre box girder at the front and on the previously concreted slab at the rear.