PERIform Sverige, Projekt - Form, Ställning, Konstruktion - Hadath-Syrian Border Highway, Lebanon PERIform Sverige, Projekt - Form, Ställning, Konstruktion - Hadath-Syrian Border Highway, Lebanon PERIform Sverige, Projekt - Form, Ställning, Konstruktion - Hadath-Syrian Border Highway, Lebanon Fler bilder  

Hadath-Syrian Border Highway, Lebanon



One lift every day:
VARIO on CB 240 for 73 m high piers


This 430 m long viaduct is part of an Arabian trunk road connecting Lebanon and Syria. 20 piers up to heights of 73 m had to be constructed for two parallel bridge lanes.

PERI supplied the complete formwork planning as well as the formwork and climbing systems for this, and for the 14 piers for the 310 m long “Viaduct Grand Hotel” further along the road.

The bridge-builders progressed quickly with VARIO formwork sets for foundations, pier shafts and mushroom-shaped pier caps.

Använda PERI system
  • SB Stödbockar
  • CB Klättersystem
  • CB 240 climbing brackets used in the shafts enabled 6.00 m high lifts to be concreted daily.
    Horizontally arranged SB-2 brace frames carried the loads from the cantilevered pier caps.
    Considerable time and crane capacity was saved through moving complete formwork units in one lift.
    Contractor: TOTO Costruzioni, Italy
    Field Service: PERI Lebanon, Beirut and Italy, Basiano