One lift every day: VARIO on CB 240 for 73 m high piers
This 430 m long viaduct is part of an Arabian trunk road connecting Lebanon and Syria. 20 piers up to heights of 73 m had to be constructed for two parallel bridge lanes.
PERI supplied the complete formwork planning as well as the formwork and climbing systems for this, and for the 14 piers for the 310 m long “Viaduct Grand Hotel” further along the road.
The bridge-builders progressed quickly with VARIO formwork sets for foundations, pier shafts and mushroom-shaped pier caps.