PERIform Sverige, Projekt - Form, Ställning, Konstruktion - Information and Service Centre, Duesseldorf, Germany PERIform Sverige, Projekt - Form, Ställning, Konstruktion - Information and Service Centre, Duesseldorf, Germany PERIform Sverige, Projekt - Form, Ställning, Konstruktion - Information and Service Centre, Duesseldorf, Germany Fler bilder  

Information and Service Centre, Duesseldorf, Germany



Blockouts formed quickly and efficiently with ASP blockout formwork

PERI were asked to find a reasonably cheap formwork solution to construct columns and perimeter beams in one construction sequence for this project. Altogether 288 window openings with the same width, and about 485 linear metres of column façade were to be constructed over three floors in only eight weeks.

DOMINO light-weight framed formwork was used for the walls with stacking elements lying flat on top for the perimeter beams. The vertical linings of the ASP blockout formwork provided the column formwork and the corner linings provided the formwork for the beam soffits.

Använda PERI system
  • DOMINO väggform
  • No time-consuming timber, plywood or strutting work was necessary because of the prefabricated ASP blockout formwork.
    The results achieved are impressive and the site personnel were highly satisfied. Even after 20 uses the formwork sets were transported to the next construction site for reuse.
    The accuracy achieved through inserting the stiffening panels was impressive, because this made continuous measuring and squaring unnecessary.
    The pre-determined striking space enabled the timber linings to be quickly removed and prepared for the next concreting section in the shortest possible time.
    Contractor: Josef Pick GmbH & Co. KG, Grevenbroich
    Field Service: PERI Germany, Willich
    PERI kontor: PERI GmbH, Germany