Old Allegheny County Jail, Pittsburgh, PA, USA
PERI SKYDECK cuts Construction Time in Half Cost-effective use on a Redevelopment ProjectWith time and space at a minimum and no possibility to use a crane, Mascaro needed light and easy to handle formwork systems that allowed cost-effective fulfillment of the contractual requirements. The SKYDECK System being modular in design and consisting of lightweight aluminum components allowed for rapid erection by hand as well as the flexibility of passing components through existing window openings that work required on this jobsite. The speed of erecting and then stripping of forms amazed. With SKYDECK the crew on site was able to cut the time for forming and concrete placement operations in half.
|