Guy Dolmaire Secondary School, Mirecourt, France
Top-quality Architectural Concrete Surfaces with VARIO Girder Wall Formwork for Circular and Straight Walls
For the building of a new secondary school in Mirecourt, the concrete surfaces on the coffer-type, structured external walls and the four oval-shaped stairwells were designed to have high-grade finishes. This required exact scheduling for when the formwork was used. Customizers formwork elements were needed to take into account predeterminers plywood joints and tie positions, ans also versitile enough to be used on climbing formwork.
In the stairwells, the formwork units switched from tower to tower which allowed them be positioned on each of the CB climbing scaffold units which had climbed to the next pouring step. The fixing points for the CB climbing units had to be on the same axis as the formwork ties.
PERI supplied a practical and cost-effective formwork solution based on the VARIO girder wall formwork system: VARIO special elements for the straight walls and VARIO circular formwork components for the radial sections.
|
| Använda PERI system |
CB Klättersystem
VARIO GT 24 Formbalkar
|
| Contractor: |
Petot S.A.S. Epinal |
| Field Service: |
PERI France, Agence Est, Bernolsheim |
|