PERIform Sverige, Projekt - Form, Ställning, Konstruktion - IBC Investment Banking Center, Frankfurt/Main, Germany PERIform Sverige, Projekt - Form, Ställning, Konstruktion - IBC Investment Banking Center, Frankfurt/Main, Germany PERIform Sverige, Projekt - Form, Ställning, Konstruktion - IBC Investment Banking Center, Frankfurt/Main, Germany Fler bilder  

IBC Investment Banking Center, Frankfurt/Main, Germany



Fast and Accurate
ACS Self-Climbing Technology for Highrise Buildings

For the construction of the 112 m high Investment Banking Centre (IBC) office block, PERI engineers developed an efficient concept for the core, facade and slabs of the building. The dividing of the ground plan area into four sections meant that concreting could be done on a daily basis. Resulting in a complete floor being finished every four days.

The formwork concept:

Core
Each of the four cores were concreted with their respective facade sections in the same cycle. The internal formwork for the core could be moved using special stripping aids placed on a shaft platform. PERI UP Rosette working platforms in the core chamber optimised the concreting and reinforcement work. The external formwork had integrated guardrails and was moved, together with the finishing and working platforms, by crane from cycle to cycle.

Slabs
The contractors decided in favour of SKYDECK aluminium panel slab formwork due to the easy handling and problem-free alignment. Through their high load capacity, MULTIPROP props provided a cost-effective solution for the temporary support required for two storeys.

Facades
ACS-R climbing units with VARIO girder wall formwork were used for the facades. The integrated foldable and spindled formwork, which was mounted to the climbing scaffold, proved to be particularly time-saving for the reinforced concrete columns of varying dimension, corner walls and the 1.00 m high edge beam and parapet.

Använda PERI system
  • SKYDECK
  • MULTIPROP
  • ACS R Självklättersystem
  • Dipl.-Ing. (FH) Horst Pullmann
    Site Manager
    “Based on the experience from previous projects, such as the BFG Highrise or Japan Centre, I know what I’m getting with PERI – there’s absolutely no risk involved! Once again, the good cooperation and the proven PERI service paid off as we could make up a lot of time on the typical floors.”
    Contractor: Joint Venture HOCHTIEF AG, Frankfurt, Philip Holzmann AG, Frankfurt, STRABAG Hoch- und Ingenieurbau AG, Rhein-Main-Neckar
    Field Service: PERI Germany, Weissenhorn and Frankfurt
    PERI kontor: PERI GmbH, Germany