PERIform Sverige, Projekt - Form, Ställning, Konstruktion - Gottlieb-Daimler-Stadium Stuttgart, Germany

Sportstadioner

PERIform Sverige, Projekt - Form, Ställning, Konstruktion - Gottlieb-Daimler-Stadium Stuttgart, Germany PERIform Sverige, Projekt - Form, Ställning, Konstruktion - Gottlieb-Daimler-Stadium Stuttgart, Germany PERIform Sverige, Projekt - Form, Ställning, Konstruktion - Gottlieb-Daimler-Stadium Stuttgart, Germany Fler bilder  

Gottlieb-Daimler-Stadium Stuttgart, Germany



MULTIPROP Falsework: Flexible, high loading capacity and approved by the construction safety Authorities

The stadium, constructed in stages from 1932 onwards, was generously modernized with a main stand building and new surrounding stands.

44 VIP lounges, that can be hired the whole year and can also serve as offices, are a part of the new concept. The Stuttgart marketing strategists joined a countrywide trend with this, by which new customers and markets are to be developed to secure theexistence of the club.

Använda PERI system
  • MULTIFLEX
  • MULTIPROP
  • Safety and cost advantages through a licenced application
    According to the recognized standards and rules in falsework and formwork construction (e.g. DIN 4421) the stability of falsework is to be proved for each use. This involves a great deal of work for normal systems and is therefore associated with high costs.
    Not so with the PERI MULTIPROP system, because PERI, as the only manufacturer, has a licence both for the individual prop as well as for the system, and the type certificate resulting from this for almost every practical erection variation up to a maximum height of 14.40 m.
    This is of great importance, because with such falsework systems the proof of stability is constructionally impossible without submitting a licence.
    Conclusion: if the user wants to be certain to be able to erect the planned scaffolding with the agreement of the responsible structural engineer, a system with a construction supervisory licence must be selected.
    Two 270 mm and 300 mm thick floor slabs were to be constructed for the main stand building at a height of 9.64 m and 13.04 m, that were to be held in position until the final integration into the steel construction of the other stands above. An ideal application for the MULTIPROP system.
    The advantages of the lightweight aluminium system were clear, especially for the steel construction of the staircases in the main stand: Through the flexible construction grid – square and rectangular – the MULTIPROP falsework could be ideally adjusted to the steel construction.
    Contractor: Ed. ZUEBLIN AG, Stuttgart
    Field service: PERI Germany, Stuttgart and Weissenhorn
    PERI kontor: PERI GmbH, Germany