Where constructing foot bridges over railway lines the closure time must be minimized. The PERI engineers in Barcelona aware of this limitation decided on a prefabricated section which could be craned into position.
|
|
The wish of scaffolders to combine modular and frame components in one system without a difficult interchange is now possible with PERI UP.
|
|
The roof over the entrance area of the Terra Mitica theme park of Benidorm is a 50.00 m diameter concrete ring construction supported on steel columns.
|
|
The shape and features on church spires vary and require assessment each time.
|
|
The 40.00 m high church tower at Lapalisse required full consideration before any material was delivered to site.
|