Använda PERI system

GT 24

Matrix-Adex Condominiums, Toronto, ON

Matrix-Adex Condominiums, Toronto, ON, Canada

The Matrix-Adex is the second phase of a multi-phase project to construct 25 Luxury high rise condominiums in downtown Toronto.

Øresund Link between Denmark and Sweden - The bridges

PERI formwork, scaffolding and tie systems had been used in the production of the bridge deck panels and the tunnel segments.
Øresund Link between Denmark and Sweden

Øresund Link between Denmark and Sweden - The tunnel

In the year 2000 the Øresund Project will link Denmark and Sweden with a four-lane motorway and double-track railway.
Weald and Downland Open Air Museum, West Sussex (under construction)

Weald and Downland Open Air Museum, West Sussex, United Kingdom

The Weald and Downland Open Air Museum, near Chichester, accommodates a fascinating collection of over 40 historical buildings.
Water Reservoir, Aprilia, Italy

Water Reservoir, Aprilia, Italy

During the construction of this drinking water container of 3,000 m³ capacity, the use of the PERI systems allowed optimum adjustment to the geometry of the building construction.
 Sida:  3