The Hyundai Development Company is currently constructing an impressive high-rise project in Seoul, Korea.
|
|
With time and space at a minimum and no possibility to use a crane, Mascaro needed light and easy to handle formwork systems that allowed cost-effective fulfilment of the contractual requirements.
|
|
If high qualities of concrete surfaces are required, RAPID is the right choice. This lightweight aluminum column formwork enables to manufacture flawless concrete finishes in a very cost-effective way.
|
|
This 4-storey 8“ (0.20 m) and 12“ (0.30 m) flat slab construction will combine high tech office space with self storage and parking facilities after completion.
|
|
PERI was awarded this project with a very limited lead time: Within one week from signing the contract, 15,000 sqft (1,394 m²) of assembled VARIO panels and 13,000 sqft (1,208 m²) of SKYDECK were delivered.
|