|
The Prague Metro constructed a 850 m long tunnel to reduce the noise levels for people living near the line.��
|
|
A new 36.70 m long road bridge was built to carry the new N4 road over the river Tommarpsan. Steel I-beams crossing the river supported the PERI UP shoring system used to concrete the bridge deck.
|
|
PERI UP Rosett provided on the Swietokrzyski bridge a safe working platform for the cable installers.
|
|
The steel arch bridge was sand blasted then repainted, with repairs to the underside of the concrete bridge deck. This required working platforms to follow the arch profile, around struts and within working distance of the deck soffitt.
|
|
A 4,500 m² working platform was constructed to assemble the 3-D steel truss roof of the new sports hall in Aarhus.
|