During the construction of this drinking water container of 3,000 m³ capacity, the use of the PERI systems allowed optimum adjustment to the geometry of the building construction.
|
|
The new ZEPPELIN Branch in Weissenhorn is a sample for future sales centres of the construction machinery trading company.
|
|
One of the largest distribution centres in Europe has been constructed with an area of more than 60,000 m² at the new Central Park industrial facility at Rugby.
|
|
PERI provided the formwork and supporting scaffolding on a day to day basis, so that the work could be started in the shortest possible time after the order was received.
|
|
To use wind power is seen as an ecologically sensible way of extracting energy. An off-shore plant was constructed for this purpose in the sea, two kilometres away from Copenhagen harbour.
|