|
The Beachwood Place Parking Garage is a 230,000 sqft (21,400 sqm) one level posttensioned 9" (23 cm) slab with a clear story height which varied from 12''-3" (3.73 m) to 17''-0" (5.18 m).��
|
|
One of Canada´s largest construction sites would definitely describe the Niagara Falls Casino located in Ontario.
|
|
The Torpharm Expansion project was scheduled for completion 11 months after starting.
|
|
In order to compensate travallers from the new Northwest Airlines terminal, a Westin Hotel was constructed.
|
|
The new Warsaw Inter-Continental Hotel has 50 floors with a total height of 163.60 m.
|