Olympic village

Athens, Greece, Construction for the Olympic Games:

After 108 years, the Olympic Games are returning to its spiritual home in 2004 with different sporting events taking place in and around Athens.
European Patent Office, Munich

European Patent Office, Munich

Due to the increased number of member states, the European Patent Office (EPO) urgently needs more space to be able to manage the expected flood of registrations for new inventions.
HD 200 props at 400 mm centres form a temporary wall.

CTRL Contract 240, Barrington Road Vent Shaft, Barking, East London, United Kingdom

The construction of twin-bore running tunnels, 4.7 km long, together with ventilation shafts and headhouses located at Barrington Road and Woodgate Road forms part of the £7bn Channel Tunnel Rail Link project.
Malt Silo, Vitry le François, France

Malt Silo, Vitry le François, France

The construction of this circular malt silo with a 35 m diameter presented the contractors with tough challenges with regards to the concrete surface quality and tight schedule.
The PERI protective roof construction reduced assembly time by 2 weeks compared to the originally planned use of a steel construction. Photo: PERI GmbH

Roof renovation, Kiel main railway station, Germany

The almost 50-year old steel construction of the vaulted roof over the Kiel main railway station is undergoing a complete renovation with some elements being completely replaced.��